You may need a permit to build a backyard pond. Requirements depend on your location and the proposed pond’s size, depth, and associated work. Contact your city or county building and zoning department before starting construction.
Provide the planned pond dimensions, depth, location, and any electrical work. Ask about:
- Building and zoning approval: Whether a permit is required and what plans you need to submit.
- Placement restrictions: Required distances from property lines and buildings, and restrictions involving easements or drainage.
- Fences or safety barriers: Whether your pond falls under local pool or water-feature safety requirements.
- Electrical permits: Whether installing power for pumps or lighting requires a separate permit or inspection.
If your property has a homeowners association (HOA), check its approval requirements before construction.
Before digging in the United States, contact your state’s 811 service to request underground utility marking. Wait the required time and confirm that all utilities have responded before excavation begins.